Send Message
Home

Sinomemb Environment Technology (beijing) Co., Factory Tour

I'm Online Chat Now
  • Production Line

    RO membrane capacity: 3 million square meters/year, ultrafiltration membrane capacity: 2 million square meters/year The newly constructed high performance gas separation membrane industrialization project, with a total investment of 120 million RMB, covers an area of 20000m2, and takes the lead in the industrial production and demonstration application of carbon capture membrane and other cutting-edge membrane products in the world. The gas separation membrane capacity is 1.5 million square meters per year, equivalent to the annual processing of raw gas 20-300 million CBM.The total carbon dioxide treatment capacity is 20-30 million CBM of solidified carbon dioxide captured annually.
    Sinomemb Environment Technology (beijing) Co., factory production line 0
    Sinomemb Environment Technology (beijing) Co., factory production line 1
    Sinomemb Environment Technology (beijing) Co., factory production line 2
    Sinomemb Environment Technology (beijing) Co., factory production line 3
    Sinomemb Environment Technology (beijing) Co., factory production line 4
    Sinomemb Environment Technology (beijing) Co., factory production line 5
    Sinomemb Environment Technology (beijing) Co., factory production line 6

     

Contact Details
Sinomemb Environment Technology (beijing) Co.,

Contact Person: Mr. Gao

Tel: +8618610069839

Send your inquiry directly to us (0 / 3000)